At the end of 2013 „Building Development Holding” EOOD started the implementation of project site „Completion of Construction of the Sewerage Network and Partial Reconstruction of the Water Supply Network in the Town of Silistra” (engineering)” under the project „Construction of Regional WWTP in the Town of Silistra, Completion of Construction of the Sewerage Network and Partial Reconstruction of the Water Supply Network in the Town of Silistra”, financed under OP “Environment 2007 – 2013”, with Silistra Municipality as a Contracting Authority.

The engineering works for detailed design phase, construction, designer’s field supervision and commissioning comprise: new sewers, domestic sewage system after storm water overflows, storm water sewage system along the trace of the domestic sewage system, storm water overflows for separation of the sewage system – 16 pcs., water supply network – 9 km, sewage network – 31 km, building water pipe diversions (BWPD) – 250 pcs. and building sewerage pipe diversions (BSWD)- 440 pcs.